Production

Loading...

TYPICAL PROJECT

– Subsea structures

– Offshore & Onshore structure

– Process skids

– Hose reels

– Tension systems

– Tanks (Atm & Pressurized)

– Piping

CAPABILITIES

– Steelwork

– Piping: Prefabrication and fabrication

– Hydraulic/Tubing: OLF certified personnel

– Welding methods: 111, 136, 141

– Testing: FAT, EFAT, pressure and lifting test

CAPACITY

– 3000 m2 production hall with 100T lifting capacity at deep water quay

– 1540 m2 production hall with lifting capacity of 2 x 15T cranes and 2 x 6,3T cranes

– Floating crane with 400T lifting capacity

– A separate production hall for AISI316, Duplex, SuperDuplex

– 90 specialized workers


Heistad
(Situated approx 5 km from Brevik)

– Main production hall 22 m 70 m x 13 m

– Cranes 2 x 15T

– Cranes 2 x 6,3T

– Separate fabrication hall for special materials

(SS304, SS316, Duplex, Super Duplex, Titanium)

– Machining capacity

– Paintshop (Sub-supplier)


Brevik

– Production hall 30 m x 100 m x 22 m, Gate 20 m x 15 m

– Hall for surface treatment 15 x 25 m, Gate: 14 x 13 m

– Floating crane 400T

– Quay (4000T), crane 1 x 20T

– Load bank 2 x 4,8 MW

– Power factor 0,8 to 1,0

– Manned storage facilities

– Office facilities for clients


Romania (Braila)

Hull Factory:

Floor Area: 31 000 m2

Lifting: 4 off 50T

Outfitting Factory:

Floor Area: 27 000 m2

Other Facilities:

Quay: 1300m2

Platform: 150 000m2

Lifting: 2200T